Raytheon RTX Forging Supplier India: Missile and Propulsion Components


Raytheon Technologies (RTX) — through its Raytheon Missiles & Defense and Pratt & Whitney divisions – consumes forged titanium, Inconel, and alloy steel structural components for Tomahawk cruise missiles, AIM-120 AMRAAM, Patriot missile systems, and F135/F119 military aeroengines. Indian forging manufacturers with AS9100D, ITAR infrastructure, and Ti-6Al-4V ring rolling capability are positioned to supply Raytheon through its US tier-1 supply chain.


DivisionComponentMaterialITAR Level
RMDTomahawk body ringTi-6Al-4VVery high — TAA required
RMDAMRAAM structural ringTi-6Al-4VVery high
P&WF135 compressor discInconel 718High — TAA required
P&WF135 fan discTi-6Al-4VHigh

Raytheon Missiles & Defense (RMD) : Tomahawk body section rings (Ti-6Al-4V, Ø520mm), AMRAAM guidance section rings (Ti-6Al-4V, Ø178mm), Patriot missile structural rings. All programme drawings ITAR-controlled – TAA required. AS9100D mandatory. MIL-SPEC heat treatment and NDE.

Pratt & Whitney : F135 engine rotating component forgings Inconel 718 compressor discs, Ti-6Al-4V fan discs. NADCAP mandatory for heat treatment and NDE. PWA specification requirements apply.

Access pathway : RMD missile programme supply requires TAA establishment (3–6 months DDTC processing). The most accessible Raytheon entry point is through P&W commercial engine supply (GTF engine for A320neo) commercial aeroengine programmes have lower ITAR barriers than military propulsion.

Vinir Engineering’s Capability

  1. AS9100D full scope.
  2. Ti-6Al-4V ring rolling to Ø4,500mm – covers Tomahawk and AMRAAM body section ring diameter ranges.
  3. Inconel 718 double ageing with AMS 2750 TUS at 718°C.
  4. ITAR awareness procedure.
  5. TCP preparation for RMD missile programme engagement.


Frequently Asked Questions

1.Can Indian forging manufacturers supply Raytheon Tomahawk body forgings directly?+
Direct supply requires a TAA between Raytheon and the Indian forging manufacturer DDTC processing takes 3–6 months. The Indian facility must have an approved TCP before drawings are transmitted. ITAR penalties for non-compliance include criminal prosecution and civil penalties up to $1M per violation the compliance framework is non-negotiable. The practical initial pathway is through US tier-1 precision machining companies who are already TAA-covered and subcontract ring rolling to Indian sources under the same TAA umbrella. Direct Raytheon TAA establishment is the medium-term goal once the initial supply relationship is established.